Wednesday, 28 November 2012

Port lights and hatches frames

Few items are done this month and few are on the way.

Sail locker hatch frame

Another one

Closer view

Portlight frame molds
Version #1 at right - too shallow
Version #3  at the left  - way to go 

First frame out
(5 mm of solid glass)

Another view

Monday, 12 November 2012

Current state of the project

Seems like the active work in shed is over for the season :(
So I'll move to my garage to build windows, hatch supports and water and waste systems over the winter.
There are few pictures of my boat up to now.

Waste tank support

45 gallon tank dry fitted
(starboard side)

The same tank (but water)
is gonna be installed on port side

Cockpit (port)

Cockpit (starboard)

Deck (starboard)

Starboard deck  (bow view)


Cabin from inside (port side)

Cabin from inside (port side)

Inside the starboard hull
(view from bow)

Inside the starboard hull
(view from aft)

Outer panel (starboard).
Some taping is still required.