Building Flip-Flops Catamaran
Thursday, 8 March 2012
Rudders. Work in progress.
Last weekend I cut both rudders on CNC machine. It took about 7 hours for 4 sides. Slow, but precise.
After final shaping
NACA 63-012
20x32" rudders
Bulkhead steeering case with flange welded in (BTW, I also cat this 1/4" flange on the same CNC machine).
First glassed rudder in vacume bag. I hope to do the second one tomorrow.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment