![]() |
| Rudder post in progress (starboard) |
![]() |
| Port nose cone |
![]() |
| Anchor chain locker |
![]() |
| Starboard nose cone |
![]() |
| Front crossbeam lockers |
![]() |
| Port sail locker |
![]() |
| Trampoline area |
![]() |
| Seagull striker and anchor roller |
![]() |
| Startboard nose cone |
![]() |
| Rudder post in progress (starboard) |
![]() |
| Port nose cone |
![]() |
| Anchor chain locker |
![]() |
| Starboard nose cone |
![]() |
| Front crossbeam lockers |
![]() |
| Port sail locker |
![]() |
| Trampoline area |
![]() |
| Seagull striker and anchor roller |
![]() |
| Startboard nose cone |
![]() |
| 2'x2' deck hatch bases |
![]() |
| 2'x2' deck hatch bases |
![]() |
| Cabin windows |
![]() |
| 4.5mm of solid glass |
![]() |
| 8' long |
![]() |
| Vacuum bagging |
| Waste tank support |
| 45 gallon tank dry fitted (starboard side) |
| The same tank (but water) is gonna be installed on port side |
| Cockpit (port) |
| Cockpit (starboard) |
| Deck (starboard) |
| Starboard deck (bow view) |
| Cabin |
| Cabin from inside (port side) |
| Cabin from inside (port side) |
| Inside the starboard hull (view from bow) |
| Inside the starboard hull (view from aft) |
| Outer panel (starboard). Some taping is still required. |