![]() |
Rudder post in progress (starboard) |
![]() |
Port nose cone |
![]() |
Anchor chain locker |
![]() |
Starboard nose cone |
![]() |
Front crossbeam lockers |
![]() |
Port sail locker |
![]() |
Trampoline area |
![]() |
Seagull striker and anchor roller |
![]() |
Startboard nose cone |
![]() |
Rudder post in progress (starboard) |
![]() |
Port nose cone |
![]() |
Anchor chain locker |
![]() |
Starboard nose cone |
![]() |
Front crossbeam lockers |
![]() |
Port sail locker |
![]() |
Trampoline area |
![]() |
Seagull striker and anchor roller |
![]() |
Startboard nose cone |
![]() |
2'x2' deck hatch bases |
![]() |
2'x2' deck hatch bases |
![]() |
Cabin windows |
![]() |
4.5mm of solid glass |
![]() |
8' long |
![]() |
Vacuum bagging |
Waste tank support |
45 gallon tank dry fitted (starboard side) |
The same tank (but water) is gonna be installed on port side |
Cockpit (port) |
Cockpit (starboard) |
Deck (starboard) |
Starboard deck (bow view) |
Cabin |
Cabin from inside (port side) |
Cabin from inside (port side) |
Inside the starboard hull (view from bow) |
Inside the starboard hull (view from aft) |
Outer panel (starboard). Some taping is still required. |