Wednesday, 28 November 2012

Port lights and hatches frames

Few items are done this month and few are on the way.

Sail locker hatch frame


Another one


Closer view


Portlight frame molds
Version #1 at right - too shallow
Version #3  at the left  - way to go 


First frame out
(5 mm of solid glass)


Another view



Monday, 12 November 2012

Current state of the project

Seems like the active work in shed is over for the season :(
So I'll move to my garage to build windows, hatch supports and water and waste systems over the winter.
There are few pictures of my boat up to now.

Waste tank support










45 gallon tank dry fitted
(starboard side)











The same tank (but water)
is gonna be installed on port side











Cockpit (port)










Cockpit (starboard)










Deck (starboard)










Starboard deck  (bow view)










Cabin










Cabin from inside (port side)










Cabin from inside (port side)










Inside the starboard hull
(view from bow)














Inside the starboard hull
(view from aft)














Outer panel (starboard).
Some taping is still required.

Friday, 29 June 2012

Thursday, 28 June 2012

More floor supports

Starboard














Port side. Sealed.
Ready for two-components foam.

Wednesday, 27 June 2012

Captain's stand

With lid fitted




















Small (20 gal) head water tank
will be installed here

Monday, 11 June 2012

Cabin roof

Roof panel is there.


















Daggeboard cases


Daggerboard cases have been glued from inside.
 
Starboard side
















Port














Startboard from outside.
More sanding is required


Sunday, 27 May 2012

Saloon bulkhead in progress

Bulkead is taking a shape











Mast post has been glassed from outside